Samsung SV-651B Manual de Serviço Página 108

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 107
GE HEALTHCARE
DIRECTION 5194296-100, REVISION 10 LOGIQ BOOK XP SERIES BASIC SERVICE MANUAL
4-2 Section 4-3 - General Procedure
Section 4-3
General Procedure
4-3-1 Power On/Boot Up
After AC/DC is connected correctly to the system, the power is applied to the system. When the Control
panel Power On/Off key is pressed once, the System starts.
4-3-1-1 System Power On
Lower the handle. Plug the AC adapter output connector into the system DC input port (located on the
system’s rear panel) with the arrow side upward. Plug the AC adapter power cord into a grounded,
protective earth outlet.
Figure 4-1 connect AC adapter
When power is applied to the system, power is distributed to the Cooling Unit, Control Panel, LCD,
Peripherals and the Back-end Processor.
CAUTION
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The
covers are required for safe operation, good system performance and cooling purposes.
NOTICE
Lockout/Tagout Requirements (For USA only)
Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the Power Cable
on the system.
Signed
Date
TA G
&
LOCKOUT
Vista de página 107
1 2 ... 103 104 105 106 107 108 109 110 111 112 113 ... 225 226

Comentários a estes Manuais

Sem comentários