
1. General installation Guide
18
(3) Connecting the equipment
Process photo Work details
Things to obey
(installer)
Items to check (manager)
Mounting an
indoor unit.
A group of two works on
the indoor unit.
Check for levelness of the
indoor unit and damage to
the indoor unit.
(4) Inserting a vibration-proof rubber mat
Process photo Work details
Things to obey
(installer)
Items to check (manager)
Insert a vibration
proof rubber mat
between the bolt
and the indoor
unit to prevent
transfers of the
vibration.
Do not allow the vibration
proof rubber mat to be
inclined toward either
side. Do not omit any of
them.
Check the insertion condition
of the vibration proof rubber
mat.
(5) Check the horizontal height
Process photo Work details
Things to obey
(installer)
Items to check (manager)
Adjust the
horizontal
height.
Check the levelness
condition of the indoor
unit.
Considering the ceiling
finishing line, check your
installation.
(6) Installation completed
Process photo Work details
Things to obey
(installer)
- - -
Comentários a estes Manuais